How much electricity do data centres use in the UAE and the Gulf?
Short answerAbout 3 TWh in the UAE in 2025, around 2% of its electricity (one firm’s estimate).
About 3 TWh in 2025, by Wood Mackenzie, a research firm. That was approximately 2% of the UAE’s 173 TWh of electricity demand. It expects over 6 TWh by 2030, at least 2 times as much. Hum could not find a figure from the UAE government or its power companies. In Saudi Arabia, the research centre KAPSARC puts data centres at around 2.8 TWh in 2024, or 0.85% of the country’s electricity. It says that could reach between 10.2 and 42.2 TWh by 2030. The estimates don’t agree. The International Energy Agency (IEA) puts the whole Middle East at 1.7 TWh in 2025, less than the estimate for either country alone. What is planned is far bigger than what exists. The IEA counts 0.4 GW of data-centre capacity in the Middle East in 2025, and a pipeline of projects of almost 10 GW. In Abu Dhabi, G42 and OpenAI have announced Stargate UAE, a 1 GW cluster inside a campus planned for 5 GW. The first 200 MW is expected in 2026. These are announcements, not measurements. Capacity (MW or GW) is the most power a site can draw at once, not the energy it uses in a year (TWh). Hum’s rough ceiling: 1 GW running flat out all year would use 8.76 TWh, about 2.9 times what all the UAE’s data centres used in 2025. The full 5 GW would use 43.8 TWh, about 25% of the UAE’s electricity demand in 2025. Real use would be lower. G42 says the campus will be powered by nuclear, solar and natural gas. Abu Dhabi is also building a 1 GW gas power plant that will supply data centres. Today 68% of the UAE’s electricity comes from fossil fuels and 32% from low-carbon sources, by Ember, an energy research group.
The bigger pictureData centres worldwide used about 485 TWh of electricity in 2025 (IEA). The UAE’s 3 TWh is roughly 0.62% of that. The two figures come from different sources.
Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh. 1 TWh = 1 billion kWh.
- 1.7 TWh Whole Middle East, 2025: IEA estimate
- 2.8 TWh Saudi Arabia, 2024: KAPSARC estimate, 0.85% of Saudi electricity
- 3 TWh UAE, 2025: Wood Mackenzie estimate, approximately 2% of UAE demand
- 6 TWh UAE, 2030, forecast: Wood Mackenzie says over 6 TWh
Unit: TWh a year.
Why the claim misleads
The UAE and Saudi Arabia want to become hubs for AI, and they have the money and the energy to try. US companies such as OpenAI and Oracle are building there with local partners such as G42.
What nobody knows yet
- Hum could not find an official figure from the UAE government or its power and water companies for how much electricity data centres use. The 3 TWh is one research firm’s estimate.
- The estimates don’t fit together. Added up, the UAE and Saudi estimates are about 3.4 times the IEA’s figure for the whole Middle East. They may count different things.
- Nobody knows how much of the announced capacity will be built, or how hard it will run. The IEA says the delay or cancellation of a single project could change the outlook for the region.
- Hum found no figures for Qatar, Kuwait, Bahrain or Oman.
Sources (16)
- Wood Mackenzie (research firm), news release (26 March 2026; yearly consumption) Estimated
“Data centres consumed 3 TWh in 2025, representing approximately 2% of the UAE's 173 TWh total electricity demand.”
Quote checked on the page, 15 Nov 2026 - Wood Mackenzie (research firm), news release (26 March 2026; a forecast) Forecast
“data centres in the United Arab Emirates will double their power consumption to over 6 TWh by 2030”
Quote checked on the page, 15 Nov 2026 - IEA, Key Questions on Energy and AI (2026, report PDF), Table A.4: data centres’ total electricity consumption by region, Base Case. The four columns are 2023, 2024, 2025 and 2030; 2030 is a projection Estimated
“Total electricity consumption (TWh) World 360 416 485 945 … Middle East 1.3 1.5 1.7 3.0”
Quote checked on the page, 15 Nov 2026 - IEA, Key Questions on Energy and AI (2026, report PDF), Table A.2: data centres’ total installed capacity by region in GW (capacity, not yearly consumption). The four columns are 2023, 2024, 2025 and 2030; 2030 is a projection Estimated
“Total installed capacity (GW) World 83 97 114 226 … Middle East 0.3 0.4 0.4 0.7”
Quote checked on the page, 15 Nov 2026 - IEA, Key Questions on Energy and AI (2026, report PDF; capacity of announced projects, not yearly consumption) Estimated
“in the Middle East, the pipeline of gigafactory data centres is an order of magnitude larger than the region’s entire installed data centre capacity today (Epoch AI, 2026a). The total project pipeline in the Middle East is almost 10 GW.”
Quote checked on the page, 15 Nov 2026 - IEA, Key Questions on Energy and AI (2026, report PDF) Forecast
“because of their size relative to existing infrastructure, the cancellation or delay of a single project could fundamentally change the outlook for data centre electricity consumption”
Quote checked on the page, 15 Nov 2026 - G42 (UAE technology company), news release “Global Tech Alliance Launches Stargate UAE” (22 May 2025; an announcement of planned capacity) Company says so
“Stargate UAE, a 1-gigawatt compute cluster, will be built by G42 and operated by OpenAI and Oracle.”
Quote checked on the page, 15 Nov 2026 - G42 (UAE technology company), news release “Global Tech Alliance Launches Stargate UAE” (22 May 2025; an announcement of planned capacity) Company says so
“The first 200-megawatt AI cluster is expected to go live in 2026.”
Quote checked on the page, 15 Nov 2026 - G42 (UAE technology company), news release “Global Tech Alliance Launches Stargate UAE” (22 May 2025; an announcement of planned capacity) Company says so
“It will provide 5 gigawatts of AI data center capacity and regional compute resources. The facility will be powered by nuclear, solar, and natural gas to minimize carbon emissions”
Quote checked on the page, 15 Nov 2026 - KAPSARC (King Abdullah Petroleum Studies and Research Center, Saudi Arabia) and ICAIRE, discussion paper “AI and Energy: The Future of Data Centers in Saudi Arabia” (December 2025; yearly consumption) Estimated
“National data centers used around 2.8 TWh in 2024, or 0.85% of total electricity.”
Quote checked on the page, 15 Nov 2026 - KAPSARC (King Abdullah Petroleum Studies and Research Center, Saudi Arabia) and ICAIRE, discussion paper “AI and Energy: The Future of Data Centers in Saudi Arabia” (December 2025; scenarios, not a measurement) Forecast
“By 2030, this could increase to between 10.2 TWh and 42.2 TWh, representing 2.8%-11.6% of projected national electricity demand.”
Quote checked on the page, 15 Nov 2026 - Khaleej Times (UAE newspaper), carrying a report by WAM, the UAE state news agency, on an announcement by TAQA and EWEC (30 December 2025; power-plant capacity) News report
“announced the financial closing of AED3.6 billion 1GW Al Dhafra Power Plant, which will provide power to data centre projects”
Quote checked on the page, 15 Nov 2026 - Khaleej Times (UAE newspaper), carrying a report by WAM, the UAE state news agency, on an announcement by TAQA and EWEC (30 December 2025) News report
“Construction of the Al Dhafra Gas Turbine project has already begun”
Quote checked on the page, 15 Nov 2026 - Ember, United Arab Emirates country page (updated 22 April 2026; share of generation) Measured
“The United Arab Emirates generates 32% of its electricity from low-carbon sources”
Quote checked on the page, 15 Nov 2026 - Ember, United Arab Emirates country page (updated 22 April 2026; key energy data) Measured
“68% Share of electricity from fossil fuels”
Quote checked on the page, 15 Nov 2026 - IEA, Key Questions on Energy and AI (2026) Estimated
“electricity consumption from data centres roughly doubling from 485 TWh in 2025 to 950 TWh in 2030”
Quote checked on the page, 3 Oct 2026
Hum’s sums
- 6 TWh in 2030 ÷ 3 TWh in 2025 = 2 times as much (Wood Mackenzie says “over 6 TWh”, so at least 2 times)
- A ceiling, not an estimate: 1 GW × 24 hours × 365 days ÷ 1,000 = 8.76 TWh a year, if a 1 GW site ran flat out all year
- 8.76 TWh ÷ 3 TWh ≈ 2.9 times what all the UAE’s data centres used in 2025 (Wood Mackenzie’s estimate)
- 5 GW × 24 hours × 365 days ÷ 1,000 = 43.8 TWh a year, if a 5 GW campus ran flat out all year
- 43.8 TWh ÷ 173 TWh ≈ 25% of the UAE’s electricity demand in 2025
- 3 TWh in the UAE ÷ 485 TWh in the world ≈ 0.62% of the world’s data-centre electricity in 2025. Rough: the two figures come from different sources
- 3 TWh (UAE, 2025, Wood Mackenzie) + 2.8 TWh (Saudi Arabia, 2024, KAPSARC) = 5.8 TWh. 5.8 ÷ 1.7 TWh (IEA, whole Middle East, 2025) ≈ 3.4 times. Rough: the years and methods differ
Cite this
Wood Mackenzie (research firm), news release (26 March 2026; yearly consumption), as quoted in Hum, “How much electricity do data centres use in the UAE and the Gulf?”, https://humearth.org/q/uae (quote checked 15 Nov 2026).
Cite the original source first; Hum is where you found it.
What do Wh, kWh and TWh mean?
Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh, and 1 TWh = 1 billion kWh. Hum compares each number with something everyday so you don’t need the units.
Send this answer
The UAE’s data centres used about 3 TWh of electricity in 2025, around 2% of the country’s demand (Wood Mackenzie estimate). Planned AI campuses could use several times that.