Are data centres causing new gas power plants to be built?
The claim: “Data centres are causing new gas power plants to be built.”
Short answerYes, in named cases, like Meta’s data centre in Louisiana.
Yes, in some places, and the utilities’ own filings say so. In Louisiana, Entergy asked regulators to build three new gas plants of 754 MW each to serve a large new customer in Richland Parish. The customer’s name was hidden in the filing; it is now known to be Meta, for a data centre. Regulators approved the plants in August 2025, and Entergy expects two of them online in late 2028. Entergy says Meta pays its share of the costs, and that the plants will also strengthen the grid for everyone. In Georgia, Georgia Power asked to build more than 3,600 MW of new gas plants as part of a plan of about 9,900 MW, approved in December 2025, to serve fast-growing “large-load” customers such as data centres.
The bigger pictureThe IEA calls new demand from data centres a significant near-term driver of growth for gas-fired and coal-fired power, from both existing and new plants. In the US, it expects gas to be the largest source of extra electricity for data centres, adding over 130 TWh a year by 2030.
Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh. 1 TWh = 1 billion kWh.
Why the claim misleads
Utilities and regulators have tied specific new gas plants to data centres in public filings. How much gas would have been built anyway is less clear.
What nobody knows yet
- How many of the new gas plants planned across the US exist because of data centres. Hum hasn’t found a full count it could check.
- Whether all the data centres utilities are planning for will be built. If some aren’t, some plants may not be needed.
- Hum couldn’t open Entergy’s filing to the Louisiana regulator itself, so its words here are as quoted by POWER magazine.
- Georgia Power’s approved plan may differ from the more than 3,600 MW of gas it asked for. Hum hasn’t checked the final mix.
Sources (12)
- POWER magazine (19 November 2024), quoting Entergy Louisiana’s application to the Louisiana Public Service Commission News report
“With respect to generation resources, ELL [Entergy Louisiana LLC] is proposing to construct three new 1×1 CCCT generators, each of which will have a nameplate capacity of 754 MW for a combined addition of 2,262 MW of new baseload generation.”
Quote checked on the page, 8 Nov 2026 - POWER magazine (19 November 2024) News report
“A filing with the Louisiana Public Service Commission shows that Entergy plans to build more than 2 GW of natural gas-fired power generation in the state, including a 1,500-MW facility in northeast Louisiana that would provide power for a large Meta data center operation in an area off Interstate 20 in Holly Ridge (Figure 1).”
Quote checked on the page, 8 Nov 2026 - POWER magazine (19 November 2024) News report
“The name of the “Customer,” now known to be Meta, was redacted in the filing available on the PSC website.”
Quote checked on the page, 8 Nov 2026 - Entergy Louisiana, press release on the Louisiana Public Service Commission’s approval (20 August 2025) Company says so
“Two of the facilities will be located in Richland Parish and are expected to come online in late 2028.”
Quote checked on the page, 8 Nov 2026 - Entergy Louisiana, press release on the Louisiana Public Service Commission’s approval (20 August 2025) Company says so
“Importantly, Meta is paying its share of the costs for the infrastructure needed to support its operations, ensuring that other customers are protected from those expenses.”
Quote checked on the page, 8 Nov 2026 - Entergy Louisiana, press release on the Louisiana Public Service Commission’s approval (20 August 2025) Company says so
“These investments will help power one of the most advanced data centers in the world and will also reinforce our grid, create economic opportunity and support a more sustainable energy future across Louisiana.”
Quote checked on the page, 8 Nov 2026 - Georgia Power, press release (19 December 2025) Company says so
“Georgia Power announced today that the Georgia Public Service Commission (PSC) has approved a plan which will allow the company to proceed with procuring approximately 9,900 megawatts (MW) of diverse, cost-effective generation resources to serve the energy needs of a growing state.”
Quote checked on the page, 8 Nov 2026 - Georgia Power, press release (19 December 2025) Company says so
“requested the certification of more than 3,600 MW of new combined cycle natural gas generation; more than 3,000 MW of new battery energy storage systems (BESS); 350 MW of BESS plus solar; and more than 2,800 MW of power purchase agreements.”
Quote checked on the page, 8 Nov 2026 - Georgia Power, press release (19 December 2025) Company says so
“The company’s latest report in November highlights that large-load growth continues to materialize with thousands of megawatts of new electrical load projected in the coming years and construction underway or pending for nearly 30 large-load projects across the state.”
Quote checked on the page, 8 Nov 2026 - Georgia Power, Data Centers & Your Georgia Power Bill Company says so
“How does Georgia Power plan to accommodate the growth from data centers? The Integrated Resource Plan (IRP) guides investments in generation and transmission to meet forecasted energy demand, thus ensuring reliable service for all customers.”
Quote checked on the page, 8 Nov 2026 - IEA, Energy and AI (2025) Estimated
“Even so, new demand from data centres is a significant near-term driver of growth for natural gas-fired and coal-fired generation, through both higher utilisation of existing assets and new power plants.”
Quote checked on the page, 8 Nov 2026 - IEA, Energy and AI (2025), on data centres in the United States Forecast
“As demand growth is particularly rapid over the next five years, natural gas is the largest source of additional supply, adding over 130 TWh of annual generation until 2030.”
Quote checked on the page, 8 Nov 2026
Cite this
POWER magazine (19 November 2024), quoting Entergy Louisiana’s application to the Louisiana Public Service Commission, as quoted in Hum, “Are data centres causing new gas power plants to be built?”, https://humearth.org/q/new-gas-plants (quote checked 8 Nov 2026).
Cite the original source first; Hum is where you found it.
What do Wh, kWh and TWh mean?
Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh, and 1 TWh = 1 billion kWh. Hum compares each number with something everyday so you don’t need the units.
Send this answer
Yes, in named cases: Entergy is building three gas plants (2,262 MW) for the site that became Meta’s Louisiana data centre. The IEA calls data centres a significant near-term driver of new gas power.