How much of Texas’s electricity do data centres use?
Short answerAbout a twentieth in 2023, close to the US average, and growing fast.
About a twentieth, on the latest state estimate. EPRI, a US electricity research institute, estimates that data centres used 4.59% of the electricity consumed in Texas in 2023. That is about 21.8 TWh (Hum’s arithmetic). Only Virginia’s data centres used more. But Texas industry uses so much power that the share stayed close to the US average. It is growing fast. The US Energy Information Administration (EIA) says electricity consumption is growing faster in Texas than anywhere else in the US. ERCOT, the main Texas grid, carries 90% of the state’s load. In October 2024 the EIA forecast that ERCOT’s biggest flexible users, sites that can draw 75 megawatts or more, would use 54 billion kWh in 2025. That would be about 10% of the electricity consumed on ERCOT. This group counts crypto mines as well as data centres. In July 2025 the EIA forecast that demand on ERCOT would rise 7% in 2025 and 14% in 2026, as large data centres and crypto mines switch on. Far more is waiting. By September 2026, big users asking to connect to ERCOT added up to 474 GW, about 90% of it data centres, Utility Dive reported. That is about 5.5 times ERCOT’s highest demand in 2024, which was 86 GW. A GW measures power at one moment, not energy over a year, and a request is not a building. Texas passed a law in 2025, Senate Bill 6. It covers sites asking for more than 75 megawatts. They must pay towards the cost of connecting them, and share in power cuts when supply runs short. In 2026 the governor paused new data-centre connections while ERCOT audits the requests (EIA). EPRI’s simple projections for 2030 put data centres between 5.47% and 10.64% of Texas’s electricity.
The bigger pictureAcross the whole US, data centres used about 4.7% of electricity consumption in 2024 (Berkeley Lab). Worldwide it was about 1.5% (IEA). In Virginia it was 25.59% in 2023 (EPRI).
Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh. 1 TWh = 1 billion kWh.
- 1.5 % World, 2024: IEA estimate
- 4.59 % Texas, 2023: EPRI estimate
- 4.7 % United States, 2024: Berkeley Lab estimate
- 25.59 % Virginia, 2023: EPRI estimate
Unit: % of electricity.
Why the claim misleads
EPRI says Texas draws data centres because it is business-friendly and has plenty of land. Its challenges are grid reliability and how fast the grid can expand. From 2019 to 2023, electricity sales to commercial customers in Texas grew by 13 billion kWh. Only Virginia added more.
What nobody knows yet
- Nobody meters every data centre in Texas and publishes the total. EPRI’s 4.59% is an estimate for 2023. EPRI’s 2026 update, which counts crypto mining too, says Texas is level with Virginia in total data-centre power use, but gives no new share for Texas in its text.
- The EIA’s 10% is a forecast made in October 2024. It covers ERCOT, not all of Texas, and it counts every very large flexible user, crypto mines included. Hum has not found a published count of what data centres alone used in 2025.
- The 474 GW is a list of requests, not of data centres that exist. The EIA said in 2024 that when or if such planned sites come online is uncertain. ERCOT’s own files block automated readers, so Hum quotes a news report for this figure.
- The 2030 figures are simple projections, not plans. EPRI applied national growth rates to every state, and says growth is unlikely to be spread evenly.
- Nobody publishes how much of this electricity goes to AI.
Sources (23)
- EPRI (Electric Power Research Institute), Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption, white paper, May 2024 (Table 2: data-centre electricity consumption in MWh and share of the state’s electricity consumption; the first two columns are 2023, the rest are four simple projections for 2030) Estimated
“Texas 21,813,159 4.59% 28,149,002 5.47% 30,693,306 5.94% 42,507,676 8.04% 57,917,564 10.64%”
Quote checked on the page, 15 Nov 2026 - EPRI (Electric Power Research Institute), Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption, white paper, May 2024 (states ranked by estimated data-centre load in 2023) Estimated
“Ranked from highest to lowest, they are Virginia, Texas, California, Illinois, Oregon,”
Quote checked on the page, 15 Nov 2026 - EPRI (Electric Power Research Institute), Powering Intelligence 2026: Updated Scenarios of U.S. Data Center Electricity Use and Power Strategies, white paper, February 2026 (its estimates count crypto mining as well as data centres) Estimated
“Texas, on par with Virginia in absolute scale of demand (when cryptocurrency mining is included) but lower in relative terms due to large industrial power demands in the state”
Quote checked on the page, 15 Nov 2026 - US Energy Information Administration, Today in Energy (3 October 2024): Data centers and cryptocurrency mining in Texas drive strong power demand growth Measured
“In the United States, electricity consumption is growing fastest in Texas, where the Electric Reliability Council of Texas (ERCOT) manages 90% of the load on the state’s power grid.”
Quote checked on the page, 15 Nov 2026 - US Energy Information Administration, Today in Energy (3 October 2024): Data centers and cryptocurrency mining in Texas drive strong power demand growth Forecast
“we expect electricity demand from customers identified by ERCOT as large flexible load (LFL) will total 54 billion kilowatthours (kWh) in 2025, up almost 60% from expected demand in 2024.”
Quote checked on the page, 15 Nov 2026 - US Energy Information Administration, Today in Energy (3 October 2024): Data centers and cryptocurrency mining in Texas drive strong power demand growth Forecast
“This expected demand from LFL customers would represent about 10% of total forecast electricity consumption on the ERCOT grid next year.”
Quote checked on the page, 15 Nov 2026 - US Energy Information Administration, Today in Energy (3 October 2024): Data centers and cryptocurrency mining in Texas drive strong power demand growth News report
“The Electric Reliability Council of Texas (ERCOT) defines large flexible load as any facility drawing power from the grid with an expected peak demand capacity of 75 megawatts or more.”
Quote checked on the page, 15 Nov 2026 - US Energy Information Administration, Today in Energy (3 October 2024): Data centers and cryptocurrency mining in Texas drive strong power demand growth News report
“One of the main sources of growing demand for power is large-scale computing facilities such as data centers and cryptocurrency mining operations, although their future demands are uncertain.”
Quote checked on the page, 15 Nov 2026 - US Energy Information Administration, Today in Energy (31 July 2025): We expect rapid electricity demand growth in Texas and the mid-Atlantic Forecast
“We expect electricity demand within ERCOT to increase by 7% in 2025 and by 14% in 2026 when some large data centers and cryptocurrency mining facilities come online.”
Quote checked on the page, 15 Nov 2026 - Utility Dive, Texas PUC adopts softened rules on data center interconnection (21 September 2026), reporting the size of ERCOT’s queue of large electricity users asking to connect News report
“the state audits the Electric Reliability Council of Texas’ 474 GW interconnection queue, approximately 90% of which is data centers.”
Quote checked on the page, 15 Nov 2026 - Texas Legislature, Senate Research Center, bill analysis of Senate Bill 6 (S.B. 6) as enrolled, 5 August 2025, citing ERCOT’s estimate Forecast
“ERCOT estimates additional load growth between 130-150 Gigawatts (GWs) by 2030. This amount is almost double ERCOT's peak load of 86 GWs in 2024.”
Quote checked on the page, 15 Nov 2026 - Texas Legislature, Senate Bill 6 (S.B. 6), enrolled text, 2025: Utilities Code section 37.0561(c), standards for connecting large electricity users in the ERCOT region Rule or law
“The commission shall establish a demand threshold of 75 megawatts unless the commission determines that a lower threshold is necessary to accomplish the purposes described by Subsection (b).”
Quote checked on the page, 15 Nov 2026 - Texas Legislature, Senate Research Center, bill analysis of Senate Bill 6 (S.B. 6) as enrolled, 5 August 2025 Rule or law
“ensure that a large load customer who is subject to the standards adopted under Section 37.0561 contributes to the recovery of the interconnecting electric utility's costs to interconnect the large load to the utility's system.”
Quote checked on the page, 15 Nov 2026 - Texas Legislature, Senate Research Center, bill analysis of Senate Bill 6 (S.B. 6) as enrolled, 5 August 2025 Rule or law
“protecting residential customers from outages by requiring large loads to share the load shed obligation during times of shortage.”
Quote checked on the page, 15 Nov 2026 - US Energy Information Administration, Today in Energy (3 September 2026): Weekly average load in ERCOT continues near record high News report
“Amid the record-high demand, ERCOT is auditing proposals from data centers to connect to the grid, following Texas Governor Greg Abbott’s recent moratorium on new data center interconnections.”
Quote checked on the page, 15 Nov 2026 - US Energy Information Administration, Today in Energy (3 October 2024): Data centers and cryptocurrency mining in Texas drive strong power demand growth News report
“Although much planned capacity for large-load customers is awaiting approval from ERCOT, when or if the capacity will be brought online remains uncertain.”
Quote checked on the page, 15 Nov 2026 - EPRI (Electric Power Research Institute), Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption, white paper, May 2024 (Table 1: opportunities, then challenges, for each state) News report
“Texas Business-friendly; ample land availability Electric grid reliability and pace of expansion”
Quote checked on the page, 15 Nov 2026 - US Energy Information Administration, Today in Energy (28 June 2024): change in electricity sales to commercial customers, 2019 to 2023 Measured
“Electricity demand has grown the most in Virginia, which added 14 BkWh, and Texas, which added 13 BkWh.”
Quote checked on the page, 14 Nov 2026 - EPRI (Electric Power Research Institute), Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption, white paper, May 2024 Forecast
“shows the effect in 2030 of applying the annual U.S. data center growth rates (averaged across the four scenarios) to project state-level loads against a backdrop of 1% annual growth in other loads.”
Quote checked on the page, 14 Nov 2026 - EPRI (Electric Power Research Institute), Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption, white paper, May 2024 Forecast
“In reality, load growth is unlikely to be spread evenly.”
Quote checked on the page, 14 Nov 2026 - EPRI (Electric Power Research Institute), Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption, white paper, May 2024 (Table 2: data-centre electricity consumption in MWh and share of the state’s electricity consumption; first two columns are 2023) Estimated
“Virginia 33,851,122 25.59%”
Quote checked on the page, 14 Nov 2026 - Lawrence Berkeley National Laboratory, United States Data Center Energy Usage Report: 2025 Update (June 2026; US figures, consumption, crypto mining excluded) Estimated
“The updated estimate of data center electricity use in 2024 is 192 terawatt-hours (TWh), accounting for 4.7% of total U.S. electricity consumption.”
Quote checked on the page, 8 Nov 2026 - IEA, Energy and AI (2025) Estimated
“Data centres accounted for around 1.5% of the world’s electricity consumption in 2024, or 415 terawatt-hours (TWh).”
Quote checked on the page, 3 Oct 2026
Hum’s sums
- 21,813,159 MWh ÷ 1,000,000 = about 21.8 TWh (Texas data centres, 2023)
- 474 GW ÷ 86 GW = about 5.5 (requests to connect to ERCOT, against ERCOT’s highest demand in 2024; both are capacity, not energy)
Cite this
EPRI (Electric Power Research Institute), Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption, white paper, May 2024 (Table 2: data-centre electricity consumption in MWh and share of the state’s electricity consumption; the first two columns are 2023, the rest are four simple projections for 2030), as quoted in Hum, “How much of Texas’s electricity do data centres use?”, https://humearth.org/q/texas (quote checked 15 Nov 2026).
Cite the original source first; Hum is where you found it.
What do Wh, kWh and TWh mean?
Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh, and 1 TWh = 1 billion kWh. Hum compares each number with something everyday so you don’t need the units.
Send this answer
Data centres used about 4.59% of Texas’s electricity in 2023 (EPRI), close to the US average. Requests to connect now add up to 474 GW, about 5.5 times the Texas grid’s highest demand in 2024.