How much of Virginia’s electricity do data centres use?

Short answerAbout a quarter, more than in any other US state.

About a quarter. EPRI, a US electricity research institute, estimates that data centres used 25.59% of the electricity consumed in Virginia in 2023. That is about 33.9 TWh (Hum’s arithmetic). EPRI says data centres use more power in Virginia than in any other state. Dominion Energy, Virginia’s biggest power company, said in October 2025 that more than 25% of its Virginia sales go to data centres. The reason is Northern Virginia, the largest data-centre market in the world. It holds 13% of the world’s reported data-centre capacity, a state audit found. Loudoun County alone has about half of Virginia’s data-centre industry. For years this did not show: the state’s energy demand was flat from 2006 to 2020. Then it climbed. From 2019 to 2023, electricity sales to commercial customers grew by 14 billion kWh, the most of any US state. A forecast made for the state’s auditors says Virginia’s demand for power would double within 10 years if nothing held it back, with data centres the main driver. EPRI’s own simple projection puts data centres at 36% of Virginia’s electricity by 2030, averaged across its four scenarios, and almost 50% in the highest one.

The bigger pictureAcross the whole US, data centres used about 4.7% of electricity consumption in 2024 (Berkeley Lab). Worldwide it was about 1.5% (IEA). Virginia’s share is far above both.

Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh. 1 TWh = 1 billion kWh.

Share of electricity consumption used by data centres (Virginia 2023; US and world 2024)
  • 1.5 % World, 2024: IEA estimate
  • 4.7 % United States, 2024: Berkeley Lab estimate
  • 25.59 % Virginia, 2023: EPRI estimate

Unit: % of electricity.

Why the claim misleads

Northern Virginia was an early home of the internet, and data centres like to sit close to each other. So one state ended up with 13% of the world’s reported data-centre capacity, and about half of that state’s industry is in a single county, Loudoun.

What nobody knows yet
  • Nobody meters every data centre in Virginia and publishes the total. EPRI’s figure is an estimate for 2023, and Hum found no official state figure for later years.
  • Dominion’s “more than 25%” covers only Dominion’s own sales. It leaves out data centres served by electric co-operatives, where the state’s auditors expect most of the growth (about 60%).
  • The 2030 figures are simple projections, not plans. EPRI applied national growth rates to every state, and says growth is unlikely to be spread evenly.
  • The forecast that demand would double within 10 years assumes nothing holds data centres back. The auditors say building enough power stations and power lines for that would be very difficult.
Sources (19)

Hum’s sums

  • 33,851,122 MWh ÷ 1,000,000 = about 33.9 TWh (Virginia data centres, 2023)
Cite this

EPRI (Electric Power Research Institute), Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption, white paper, May 2024, as quoted in Hum, “How much of Virginia’s electricity do data centres use?”, https://humearth.org/q/virginia (quote checked 14 Nov 2026).

Cite the original source first; Hum is where you found it.

What do Wh, kWh and TWh mean?

Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh, and 1 TWh = 1 billion kWh. Hum compares each number with something everyday so you don’t need the units.

Send this answer

Data centres use about a quarter of Virginia’s electricity (EPRI, 2023). Across the whole US it’s about 4.7%.

Next questions