How much of Canada’s electricity do data centres use?

an estimate, not a count

Short answerAbout 2.1% in 2023 by the government’s estimate. Another estimate says 1% or less.

About 2.1% of Canada’s electricity consumption in 2023, by an estimate from Natural Resources Canada, a federal department. That was up from 1.4% in 2021. It comes from a market study the department paid for. It is not a count from electricity meters. Not everyone agrees. A 2025 review for an energy-efficiency programme set up under the IEA says Canada’s data centres likely use 3 to 6 TWh a year, or 0.5% to 1% of national electricity use. So the government’s figure is about 2 to 4 times the review’s. Most data centres are in a few cities. In 2024 the Canada Energy Regulator reported an estimated 239 across the country, with 81 in Toronto and 48 in Montreal. The department put the power they draw at 520 MW in the Montreal market, 320 MW in Toronto and 46 MW in Vancouver. Megawatts measure power at one moment, not energy over a year. What comes next is uncertain. The regulator’s baseline scenario assumes Canada adds 1.5 GW of data-centre load by 2030 and 3.5 GW by 2050. Its Higher scenario assumes 12 GW by 2050, which adds about 100 TWh to yearly electricity demand. The regulator says it does not give odds for any of its scenarios. The provinces have their own forecasts. Ontario’s grid operator expects data centres to make up 8.6% of the province’s demand in 2050. Hydro-Québec expects data-centre demand to grow by 4.1 TWh from 2023 to 2032. In Alberta, companies have asked to connect roughly 19,565 MW of new data-centre load. That is more than the most power the whole province has ever used in one hour, and about 16 times the 1,200 MW the grid operator allowed in its first stage.

The bigger pictureWorldwide, data centres used about 1.5% of electricity in 2024 (IEA). Next door in the US it was 4.7% (Berkeley Lab).

Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh. 1 TWh = 1 billion kWh.

Data centres’ share of Canada’s electricity consumption: the government’s estimate and an independent review
  • 1.4 % 2021, government estimate: Natural Resources Canada’s market study
  • 2.1 % 2023, government estimate: Natural Resources Canada’s market study
  • 0.5 % 2025 review, low end: 3 TWh a year
  • 1 % 2025 review, high end: 6 TWh a year

Unit: %.

Why the claim misleads

Canada draws data-centre builders with low electricity prices, above all in Quebec and British Columbia, where hydro power is plentiful. Over 80% of its electricity comes from sources that don’t emit, and the cool climate cuts cooling costs (Canada Energy Regulator).

What nobody knows yet
  • Nobody has counted the electricity Canada’s data centres use from meters. Hum hasn’t found a national count from Statistics Canada or the Canada Energy Regulator.
  • The two estimates don’t agree, and the page where the department gives its 2.1% doesn’t show how the market study worked it out.
  • The department’s years don’t line up. Its 2023 share sets data-centre use in 2023 against Canada’s total electricity use in 2022. Its 2021 share uses the total for 2019.
  • The regulator’s own pages differ on one point. Its results page says data centres make about a quarter of the growth in electricity demand in the Higher scenario. Its fact sheet says about a third. Both say 100 TWh.
  • The figures for 2030 and 2050 are assumptions and forecasts. A request to connect in Alberta is not a data centre that gets built.
  • Nobody publishes how much of this electricity goes to AI.
Sources (18)

Hum’s sums

  • 2.1% (Natural Resources Canada, for 2023) ÷ 1% (top of the review’s range) = 2.1, so about 2 times
  • 2.1% (Natural Resources Canada, for 2023) ÷ 0.5% (bottom of the review’s range) = 4.2, so about 4 times
  • 19,565 MW asked for ÷ 1,200 MW allowed in the first stage ≈ 16.3, so about 16 times as much (Alberta; capacity, not energy)
Cite this

Natural Resources Canada, Best Practice Guide for Canadian Data Centres (2024), citing a market study it commissioned (an estimate, not a meter count), as quoted in Hum, “How much of Canada’s electricity do data centres use?”, https://humearth.org/q/canada (quote checked 15 Nov 2026).

Cite the original source first; Hum is where you found it.

What do Wh, kWh and TWh mean?

Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh, and 1 TWh = 1 billion kWh. Hum compares each number with something everyday so you don’t need the units.