How much of Canada’s electricity do data centres use?
Short answerAbout 2.1% in 2023 by the government’s estimate. Another estimate says 1% or less.
About 2.1% of Canada’s electricity consumption in 2023, by an estimate from Natural Resources Canada, a federal department. That was up from 1.4% in 2021. It comes from a market study the department paid for. It is not a count from electricity meters. Not everyone agrees. A 2025 review for an energy-efficiency programme set up under the IEA says Canada’s data centres likely use 3 to 6 TWh a year, or 0.5% to 1% of national electricity use. So the government’s figure is about 2 to 4 times the review’s. Most data centres are in a few cities. In 2024 the Canada Energy Regulator reported an estimated 239 across the country, with 81 in Toronto and 48 in Montreal. The department put the power they draw at 520 MW in the Montreal market, 320 MW in Toronto and 46 MW in Vancouver. Megawatts measure power at one moment, not energy over a year. What comes next is uncertain. The regulator’s baseline scenario assumes Canada adds 1.5 GW of data-centre load by 2030 and 3.5 GW by 2050. Its Higher scenario assumes 12 GW by 2050, which adds about 100 TWh to yearly electricity demand. The regulator says it does not give odds for any of its scenarios. The provinces have their own forecasts. Ontario’s grid operator expects data centres to make up 8.6% of the province’s demand in 2050. Hydro-Québec expects data-centre demand to grow by 4.1 TWh from 2023 to 2032. In Alberta, companies have asked to connect roughly 19,565 MW of new data-centre load. That is more than the most power the whole province has ever used in one hour, and about 16 times the 1,200 MW the grid operator allowed in its first stage.
The bigger pictureWorldwide, data centres used about 1.5% of electricity in 2024 (IEA). Next door in the US it was 4.7% (Berkeley Lab).
Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh. 1 TWh = 1 billion kWh.
- 1.4 % 2021, government estimate: Natural Resources Canada’s market study
- 2.1 % 2023, government estimate: Natural Resources Canada’s market study
- 0.5 % 2025 review, low end: 3 TWh a year
- 1 % 2025 review, high end: 6 TWh a year
Unit: %.
Why the claim misleads
Canada draws data-centre builders with low electricity prices, above all in Quebec and British Columbia, where hydro power is plentiful. Over 80% of its electricity comes from sources that don’t emit, and the cool climate cuts cooling costs (Canada Energy Regulator).
What nobody knows yet
- Nobody has counted the electricity Canada’s data centres use from meters. Hum hasn’t found a national count from Statistics Canada or the Canada Energy Regulator.
- The two estimates don’t agree, and the page where the department gives its 2.1% doesn’t show how the market study worked it out.
- The department’s years don’t line up. Its 2023 share sets data-centre use in 2023 against Canada’s total electricity use in 2022. Its 2021 share uses the total for 2019.
- The regulator’s own pages differ on one point. Its results page says data centres make about a quarter of the growth in electricity demand in the Higher scenario. Its fact sheet says about a third. Both say 100 TWh.
- The figures for 2030 and 2050 are assumptions and forecasts. A request to connect in Alberta is not a data centre that gets built.
- Nobody publishes how much of this electricity goes to AI.
Sources (18)
- Natural Resources Canada, Best Practice Guide for Canadian Data Centres (2024), citing a market study it commissioned (an estimate, not a meter count) Estimated
“estimated that data centres accounted for 1.4% of total electricity consumption in 2021 ... and increased by 50% to reach 2.1% in 2023.”
Quote checked on the page, 15 Nov 2026 - Natural Resources Canada, Best Practice Guide for Canadian Data Centres (2024), footnote on the market study Estimated
“NRCan commissioned a study in 2021 to characterize the Canadian data centre market and establish the research infrastructure required to understand that market. The study was updated in 2023.”
Quote checked on the page, 15 Nov 2026 - Natural Resources Canada, Best Practice Guide for Canadian Data Centres (2024), footnotes on how the shares were worked out Estimated
“This approximates data centre consumption in 2021 relative to Canada’s 2019 total electricity use ... This result approximated data centre consumption in 2023 relative to Canada’s total electricity use in 2022 as 2023 data for Canada’s electricity consumption were unavailable at the time of calculation.”
Quote checked on the page, 15 Nov 2026 - Natural Resources Canada, Best Practice Guide for Canadian Data Centres (2024) (electric demand in megawatts: power at one moment, not energy over a year) Estimated
“electric demand in the major Canadian markets of Toronto, Montreal, and Vancouver. Electric demand was estimated at 320 MW, 520 MW, and 46 MW for these three markets respectively.”
Quote checked on the page, 15 Nov 2026 - 4E TCP (an energy-efficiency programme set up under the IEA), Data Centre Energy Use: Critical Review of Models and Results (March 2025; the authors’ own estimates) Estimated
“In Canada, data centres likely consume 3–6 TWh, equivalent to 0.5–1% of national electricity use”
Quote checked on the page, 15 Nov 2026 - Canada Energy Regulator, Market Snapshot: Energy demand from data centers is steadily increasing (2 October 2024), counting from Data Center Map News report
“There are currently an estimated 239 data centers ... operating across Canada ... Toronto and Montreal both have the most (at 81 and 48 respectively)”
Quote checked on the page, 15 Nov 2026 - Canada Energy Regulator, Canada’s Energy Future 2026 fact sheet: Current Measures scenario (17 March 2026; a scenario assumption; gigawatts of load, not energy used) Forecast
“This scenario assumes Canada adds 1.5 GW of data centre load by 2030, and 3.5 GW by 2050.”
Quote checked on the page, 15 Nov 2026 - Canada Energy Regulator, Canada’s Energy Future 2026 fact sheet: Higher scenario (a scenario assumption; gigawatts of load, not energy used) Forecast
“The scenario assumes 12 GW of data centre load in Canada by 2050. Data centre load growth makes up about a third, or 100 TWh, of the total projected end-use electricity demand growth in this scenario.”
Quote checked on the page, 15 Nov 2026 - Canada Energy Regulator, Canada’s Energy Future 2026, Results (electricity demand growth from 2023 to 2050) Forecast
“In the Higher scenario, data centre load growth makes up about a quarter, or 100 TWh, of the total projected end-use electricity demand growth.”
Quote checked on the page, 15 Nov 2026 - Canada Energy Regulator, Canada’s Energy Future 2026, Executive summary Forecast
“We do not assign probabilities to any of our scenarios.”
Quote checked on the page, 15 Nov 2026 - Canada Energy Regulator, Market Snapshot: Energy demand from data centers is steadily increasing (2 October 2024) News report
“Canada’s data center landscape is driven by low electricity costs, particularly in provinces like Quebec and British Columbia, where hydroelectricity is abundant and relatively affordable. The country’s clean energy grid, with over 80% of electricity coming from non-emitting sources, can also make it attractive for companies looking to build new data centers with a low carbon footprint. Additionally, Canada’s cool climate further enhances the energy efficiency of data centers by reducing cooling costs.”
Quote checked on the page, 15 Nov 2026 - Canada Energy Regulator, Market Snapshot: Energy demand from data centers is steadily increasing (2 October 2024), reporting Hydro-Québec’s electricity supply plan Forecast
“Hydro Québec anticipates an increase of 4.1 TWh in data center demand from 2023 to 2032 in its most recent electricity supply plan.”
Quote checked on the page, 15 Nov 2026 - IESO (Ontario’s grid operator), 2026 Annual Planning Outlook in 5 Graphs and a Map (share of Ontario’s electricity demand) Forecast
“In the Reference Scenario, data centres are expected to make up 8.6 per cent of Ontario demand in 2050, about 60 per cent more than what was previously forecast.”
Quote checked on the page, 15 Nov 2026 - Government of Alberta, AI Data Centres in Alberta: Is Alberta’s grid ready? (citing the grid operator AESO’s connection list of July 30, 2026; requests in megawatts of capacity, not energy used) News report
“Companies have asked to connect roughly 19,565 megawatts of new data centre load, far more than the AESO allowed onto the grid in this first stage.”
Quote checked on the page, 15 Nov 2026 - Government of Alberta, AI Data Centres in Alberta: Is Alberta’s grid ready? (citing the grid operator AESO’s connection list of July 30, 2026; requests in megawatts of capacity, not energy used) News report
“It studied how much new large load the existing grid could safely serve and set an interim limit of 1,200 megawatts. That interim room is now fully taken.”
Quote checked on the page, 15 Nov 2026 - Government of Alberta, AI Data Centres in Alberta: Is Alberta’s grid ready? (citing the grid operator AESO’s connection list of July 30, 2026; requests in megawatts of capacity, not energy used) News report
“Requests to connect data centres in Alberta exceed the most power the entire province has ever used in a single hour.”
Quote checked on the page, 15 Nov 2026 - IEA, Energy and AI (2025) Estimated
“Data centres accounted for around 1.5% of the world’s electricity consumption in 2024, or 415 terawatt-hours (TWh).”
Quote checked on the page, 3 Oct 2026 - Lawrence Berkeley National Laboratory, United States Data Center Energy Usage Report: 2025 Update (June 2026; US figures, consumption, crypto mining excluded) Estimated
“The updated estimate of data center electricity use in 2024 is 192 terawatt-hours (TWh), accounting for 4.7% of total U.S. electricity consumption.”
Quote checked on the page, 8 Nov 2026
Hum’s sums
- 2.1% (Natural Resources Canada, for 2023) ÷ 1% (top of the review’s range) = 2.1, so about 2 times
- 2.1% (Natural Resources Canada, for 2023) ÷ 0.5% (bottom of the review’s range) = 4.2, so about 4 times
- 19,565 MW asked for ÷ 1,200 MW allowed in the first stage ≈ 16.3, so about 16 times as much (Alberta; capacity, not energy)
Cite this
Natural Resources Canada, Best Practice Guide for Canadian Data Centres (2024), citing a market study it commissioned (an estimate, not a meter count), as quoted in Hum, “How much of Canada’s electricity do data centres use?”, https://humearth.org/q/canada (quote checked 15 Nov 2026).
Cite the original source first; Hum is where you found it.
What do Wh, kWh and TWh mean?
Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh, and 1 TWh = 1 billion kWh. Hum compares each number with something everyday so you don’t need the units.
Send this answer
Data centres used about 2.1% of Canada’s electricity in 2023, by Natural Resources Canada’s estimate. Another review says 0.5% to 1%. Nobody has counted it from meters.