How much of Australia’s electricity do data centres use?
Short answerAbout 3% of the main grid in 2025-26, forecast to reach 13% by 2035-36.
About 3% of the electricity consumed on Australia’s main grid in 2025-26, or approximately 5 TWh. The figure is from the Australian Energy Market Operator (AEMO), which runs that grid. The year runs from July to June. The grid is called the National Electricity Market (NEM). It covers eastern and south-eastern Australia. Western Australia has its own separate market. AEMO counts around 165 data centres on the main grid. Their average draw rose from nearly 200 MW in January 2018 to more than 700 MW in June 2026, about 3.5 times as much. Megawatts measure power at one moment, not energy over a year. Nearly all of it is in two states: New South Wales has 66% and Victoria has 30%. For the whole country, AEMO says 162 working data centres, mostly in Sydney and Melbourne, use around 2% of grid-supplied electricity. AEMO’s main forecast is that data-centre use triples to around 15 TWh by 2029-30, or 7.8% of the main grid’s consumption. By 2035-36 it reaches around 34 TWh, or 13%. Even then, AEMO does not expect data centres to be the grid’s largest user. These are forecasts, and they have moved. In 2025 AEMO expected approximately 12 TWh, or around 6%, by 2030. The queue is far bigger than what gets built. There are 225 projects in development with 67 GW of capacity between them, but 36% of the projects on the 2025 list were cancelled. Data centres also use much less than they sign up for: on average about 27% of their grid connection.
The bigger pictureWorldwide, data centres used about 1.5% of electricity in 2024 (IEA). The share on Australia’s main grid is about twice that.
Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh. 1 TWh = 1 billion kWh.
- 5 TWh 2025-26: Around 3% of the grid’s consumption
- 15 TWh 2029-30, forecast: 7.8% of forecast consumption
- 34 TWh 2035-36, forecast: 13% of forecast consumption
Unit: TWh a year.
What nobody knows yet
- There is no detailed official count for the whole country. AEMO’s 3% covers the main eastern grid, and its figure for the whole country, around 2%, was published earlier and comes with no total in TWh.
- AEMO’s figures are rounded: approximately 5 TWh and around 3%.
- Other estimates are higher. A 2025 review for an IEA energy-efficiency programme reports that two investment banks put Australia’s data centres at 8 to 12 TWh, or 3% to 5% of national electricity use.
- The figures for 2029-30 and 2035-36 are forecasts from one scenario, which AEMO calls Step Change. AEMO raised its forecast between 2025 and 2026.
- Nobody publishes how much of this electricity goes to AI.
Sources (15)
- Australian Energy Market Operator (AEMO), 2026 Electricity Statement of Opportunities: Data Centre Forecasting Overview (August 2026; National Electricity Market only; financial years run July to June, so FY26 is 2025-26, FY30 is 2029-30 and FY36 is 2035-36) Estimated
“Today, there are around 165 data centres that consumed approximately 5 terawatt hours (TWh) of electricity in financial year (FY) 2026, equivalent to around 3% of total NEM operational electricity consumption.”
Quote checked on the page, 15 Nov 2026 - Australian Energy Market Operator (AEMO), 2026 Electricity Statement of Opportunities: Data Centre Forecasting Overview (August 2026; National Electricity Market only; financial years run July to June, so FY26 is 2025-26, FY30 is 2029-30 and FY36 is 2035-36) (megawatts: average power drawn, not energy over a year) Measured
“Average monthly data centre demand observed across the NEM between January 2018 and June 2026 shows an increase from nearly 200 MW to more than 700 MW.”
Quote checked on the page, 15 Nov 2026 - Australian Energy Market Operator (AEMO), 2026 Electricity Statement of Opportunities: Data Centre Forecasting Overview (August 2026; National Electricity Market only; financial years run July to June, so FY26 is 2025-26, FY30 is 2029-30 and FY36 is 2035-36), FY26 data-centre demand by region Measured
“New South Wales (66%) ... Victoria (30%) ... South Australia (2%) ... Queensland (1%) ... Tasmania (<1%)”
Quote checked on the page, 15 Nov 2026 - Australian Energy Market Operator (AEMO), 2026 Electricity Statement of Opportunities: Data Centre Forecasting Overview (August 2026; National Electricity Market only; financial years run July to June, so FY26 is 2025-26, FY30 is 2029-30 and FY36 is 2035-36) News report
“Electricity supplied through the NEM is used by households, businesses and industry across eastern and south-eastern Australia.”
Quote checked on the page, 15 Nov 2026 - Australian Energy Market Operator (AEMO), 2026 Electricity Statement of Opportunities: Data Centre Forecasting Overview (August 2026; National Electricity Market only; financial years run July to June, so FY26 is 2025-26, FY30 is 2029-30 and FY36 is 2035-36), Step Change scenario Forecast
“data centre consumption is forecast to triple to around 15 TWh or 7.8% of forecast operational consumption by FY30 and grow nearly seven times to around 34 TWh or 13% of forecast operational consumption by FY36, before growth starts to taper off.”
Quote checked on the page, 15 Nov 2026 - Australian Energy Market Operator (AEMO), 2026 Electricity Statement of Opportunities: Data Centre Forecasting Overview (August 2026; National Electricity Market only; financial years run July to June, so FY26 is 2025-26, FY30 is 2029-30 and FY36 is 2035-36) Forecast
“While data centres are forecast to become a larger consumer of electricity over the next decade, they aren’t expected to become the largest.”
Quote checked on the page, 15 Nov 2026 - Australian Energy Market Operator (AEMO), 2026 Electricity Statement of Opportunities: Data Centre Forecasting Overview (August 2026; National Electricity Market only; financial years run July to June, so FY26 is 2025-26, FY30 is 2029-30 and FY36 is 2035-36) (gigawatts of capacity, not energy used) News report
“Projects in development: 225 data centres with 67 GW of combined capacity”
Quote checked on the page, 15 Nov 2026 - Australian Energy Market Operator (AEMO), 2026 Electricity Statement of Opportunities: Data Centre Forecasting Overview (August 2026; National Electricity Market only; financial years run July to June, so FY26 is 2025-26, FY30 is 2029-30 and FY36 is 2035-36) News report
“Probability of project completion: 36% of developing projects in 2025 ESOO were cancelled”
Quote checked on the page, 15 Nov 2026 - Australian Energy Market Operator (AEMO), 2026 Electricity Statement of Opportunities: Data Centre Forecasting Overview (August 2026; National Electricity Market only; financial years run July to June, so FY26 is 2025-26, FY30 is 2029-30 and FY36 is 2035-36) Measured
“Grid connection utilisation: averaging ~27% in FY26”
Quote checked on the page, 15 Nov 2026 - Australian Energy Market Operator (AEMO), media release on its 2026 Electricity Statement of Opportunities (25 August 2026; National Electricity Market) Forecast
“Data centre electricity consumption in the NEM is forecast to increase from approximately 5 terawatt hours (TWh) in 2025-26 to 34 TWh by 2035-36, increasing from around 3% to approximately 13% of electricity supplied through the grid.”
Quote checked on the page, 15 Nov 2026 - Australian Energy Market Operator (AEMO), Digital demand surge: Preparing Australia’s power systems for the rise of data centres (1 June 2026) Estimated
“Australia is currently home to 162 operational data centres nationally, predominantly in Sydney and Melbourne, accounting for around 2% of today’s grid-supplied electricity use.”
Quote checked on the page, 15 Nov 2026 - Australian Energy Market Operator (AEMO), Digital demand surge: Preparing Australia’s power systems for the rise of data centres (1 June 2026), on AEMO’s forecast from 2025 Forecast
“projected consumption to increase by around 25% annually to reach approximately 12 terawatt hours (TWh), or around 6% of grid-supplied electricity, by 2030”
Quote checked on the page, 15 Nov 2026 - Australian Energy Market Operator (AEMO), Digital demand surge: Preparing Australia’s power systems for the rise of data centres (1 June 2026) News report
“which are among the fastest growing sources of electricity demand in the National Electricity Market (NEM) and Wholesale Electricity Market (WEM)”
Quote checked on the page, 15 Nov 2026 - 4E TCP (an energy-efficiency programme set up under the IEA), Data Centre Energy Use: Critical Review of Models and Results (March 2025; here reporting estimates by the investment banks Morgan Stanley and UBS) Estimated
“In Australia, data centres currently use an estimated 8–12 TWh (3–5% of national electricity use) according to investment banks Morgan Stanley and UBS”
Quote checked on the page, 15 Nov 2026 - IEA, Energy and AI (2025) Estimated
“Data centres accounted for around 1.5% of the world’s electricity consumption in 2024, or 415 terawatt-hours (TWh).”
Quote checked on the page, 3 Oct 2026
Hum’s sums
- More than 700 MW (June 2026) ÷ nearly 200 MW (January 2018) = 3.5, so about 3.5 times the average draw. Rough: both ends are rounded
- 66% (New South Wales) + 30% (Victoria) = 96% of data-centre demand on the main grid
- Around 3% on Australia’s main grid (2025-26) ÷ 1.5% worldwide (2024) = 2, so about twice the world share. Rough: the years differ, and the 3% covers one grid, not the whole country
Cite this
Australian Energy Market Operator (AEMO), 2026 Electricity Statement of Opportunities: Data Centre Forecasting Overview (August 2026; National Electricity Market only; financial years run July to June, so FY26 is 2025-26, FY30 is 2029-30 and FY36 is 2035-36), as quoted in Hum, “How much of Australia’s electricity do data centres use?”, https://humearth.org/q/australia (quote checked 15 Nov 2026).
Cite the original source first; Hum is where you found it.
What do Wh, kWh and TWh mean?
Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh, and 1 TWh = 1 billion kWh. Hum compares each number with something everyday so you don’t need the units.
Send this answer
Data centres used about 3% of the electricity on Australia’s main grid in 2025-26, by the grid operator AEMO. It forecasts 13% by 2035-36.