How much of Singapore’s electricity do data centres use?
Short answerAbout 7% in 2020, and reported at just over a tenth by 2024.
About 7% of Singapore’s electricity consumption in 2020, or 3.40 TWh, the government told Parliament. In 2019 it was 5.3%, or 2.75 TWh. Eco-Business, a news site, reports about 6.5 TWh in 2024, slightly more than a tenth of the country’s total. That is about 1.9 times the 2020 figure. Singapore is small and short of land and clean power. So in 2019 the government paused new data centres. It lifted the pause in 2022, but new capacity is handed out in small lots: about 80 MW in the first round, and at least 300 MW more planned. Singapore already has more than 70 data centres, with over 1.4 GW of capacity between them. Capacity (MW or GW) is the most power they can draw at once, not the energy they use in a year (TWh). About 94% of Singapore’s electricity was generated from natural gas in 2024. A new law will license every data centre of at least 3 MW and set energy-efficiency rules.
The bigger pictureWorldwide, data centres used about 1.5% of electricity in 2024 (IEA). Singapore’s share is several times that, because it is a small country and a hub for the region.
Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh. 1 TWh = 1 billion kWh.
- 2.75 TWh 2019, government: 5.3% of Singapore’s electricity
- 3.4 TWh 2020, government: 7% of Singapore’s electricity
- 6.5 TWh 2024, news report: Slightly more than a tenth
Unit: TWh a year.
Why the claim misleads
Singapore is a business and internet hub for Southeast Asia, so many companies want their servers there. The country relies heavily on imported natural gas for its power, so more data centres mostly means burning more gas.
What nobody knows yet
- Hum could not find an official figure for any year after 2020. The 2024 figure is from a news report that doesn’t name its source. Ministers were still quoting 7% in 2024.
- The government was asked in Parliament in 2025 what share data centres will use once capacity grows. Its written reply gave no percentage.
- Nobody knows yet how much of the new capacity will run on low-carbon power, which Singapore would mostly have to import.
Sources (14)
- Singapore Ministry of Communications and Information (now MDDI), written reply to a question in Parliament (27 July 2021; consumption) Estimated
“In 2019, DCs accounted for approximately 5.3% (2.75 terawatt-hours, or TWh) of Singapore’s total electricity consumption. Against the backdrop of the COVID-19 pandemic and increased digitalisation, this increased by 1.7 percentage points to approximately 7% (3.40 TWh) in 2020.”
Quote checked on the page, 14 Nov 2026 - Eco-Business (news site, Singapore), 8 October 2026 (consumption; it does not name its source for the 2024 figure) News report
“Data centres consumed about 6.5 terawatt-hour (TWh) of electricity in 2024, slightly more than a tenth of Singapore’s total and up from about 7 per cent in 2020.”
Quote checked on the page, 14 Nov 2026 - Singapore Economic Development Board (EDB) and IMDA, joint press release (20 July 2022) Rule or law
“The Government informed the industry of a temporary pause in the growth of DCs in 2019 and embarked on a review.”
Quote checked on the page, 14 Nov 2026 - Singapore Economic Development Board (EDB) and IMDA, joint press release (14 July 2023) Rule or law
“After the temporary pause in the growth of DCs was lifted in 2022, a pilot DC-CFA was launched to facilitate the sustainable building of new data centre capacity.”
Quote checked on the page, 14 Nov 2026 - Singapore Economic Development Board (EDB) and IMDA, joint press release (14 July 2023; capacity) Rule or law
“will award about 80 MW of new capacity to four data centre operators through the pilot Data Centre – Call for Application (DC-CFA) exercise”
Quote checked on the page, 14 Nov 2026 - Infocomm Media Development Authority (IMDA), Singapore, Green Data Centre Roadmap (2024, PDF; capacity, not yearly consumption) Estimated
“Today, Singapore is a regional DC hub, with total capacity exceeding 1.4 gigawatts, and one of the highest concentrations of DCs in the region”
Quote checked on the page, 14 Nov 2026 - Infocomm Media Development Authority (IMDA), Singapore, Green Data Centre Roadmap (2024, PDF; capacity, not yearly consumption) Rule or law
“We aim to provide at least 300 megawatts (MW) of additional capacity in the near term, with much more through green energy deployments.”
Quote checked on the page, 14 Nov 2026 - Singapore Ministry of Trade and Industry, written reply to a question in Parliament (January 2021 sitting; capacity) Estimated
“As of 2021, there are more than 70 operational data centres (DCs) in Singapore with a total available IT capacity of about 1,000 megawatts (MW).”
Quote checked on the page, 14 Nov 2026 - National Climate Change Secretariat, Singapore, Power page (share of generation) Measured
“Since 2000, Singapore has shifted away from less efficient fossil fuels and in turn increased the percentage of natural gas used in electricity generation from 19% to about 94% in 2024.”
Quote checked on the page, 14 Nov 2026 - Singapore Ministry of Digital Development and Information (MDDI), press release on the Digital Infrastructure Bill (8 September 2026) Rule or law
“All operators of DCs with a critical IT load of at least 3MW will be licensed. As a first step, DCs will be required to meet facility-level energy-efficiency requirements, including Power Usage Effectiveness (PUE) requirements.”
Quote checked on the page, 14 Nov 2026 - Eco-Business (news site, Singapore), 8 October 2026 News report
“Singapore has become the first country in Southeast Asia to pass a law setting binding efficiency standards and clean energy requirements for data centres”
Quote checked on the page, 14 Nov 2026 - Singapore Ministry of Trade and Industry, written reply to a question in Parliament (7 January 2025) Rule or law
“In May 2024, the Government announced our aim to provide at least 300 megawatts of additional data centre capacity in the near term and potentially more through low-carbon energy deployments. The growth in capacity is in line with our projections to peak emissions in 2028.”
Quote checked on the page, 14 Nov 2026 - IEA, Energy and AI (2025) Estimated
“Data centres accounted for around 1.5% of the world’s electricity consumption in 2024, or 415 terawatt-hours (TWh).”
Quote checked on the page, 3 Oct 2026 - Singapore Ministry of Trade and Industry, speech by Senior Minister of State Low Yen Ling (June 2024) Estimated
“DCs are collectively our biggest indirect carbon emitters, contributing up to 82% of Singapore’s I&C sector emissions and 7% of our total electricity consumption.”
Quote checked on the page, 14 Nov 2026
Hum’s sums
- 6.5 TWh in 2024 ÷ 3.40 TWh in 2020 ≈ 1.9 times as much. Rough: the 2024 figure is from a news report, the 2020 one from the government
Cite this
Singapore Ministry of Communications and Information (now MDDI), written reply to a question in Parliament (27 July 2021; consumption), as quoted in Hum, “How much of Singapore’s electricity do data centres use?”, https://humearth.org/q/singapore (quote checked 14 Nov 2026).
Cite the original source first; Hum is where you found it.
What do Wh, kWh and TWh mean?
Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh, and 1 TWh = 1 billion kWh. Hum compares each number with something everyday so you don’t need the units.
Send this answer
Data centres used about 7% of Singapore’s electricity in 2020 (government figure). A 2024 news report puts it at just over a tenth.