How much of Ireland’s electricity do data centres use?
Short answerAbout 23% in 2025, up from 5% in 2015.
About 23% of the Republic of Ireland’s metered electricity consumption in 2025, by the country’s Central Statistics Office (CSO). That’s 7,663 GWh, or about 7.7 TWh. In 2015 it was 5%. This is a count, not an estimate: the CSO went through around 2.6 million electricity meters to find the ones that feed data centres. A small number of data centres use most of it. Their use has grown every single year since 2015, and is now about 6 times what it was. In 2025 it rose 10%, while everyone else’s rose 2%. Data centres now use more than all the homes in towns and cities (18%), and not far off all homes together (28%). The grid operator, EirGrid, expects data centres and other new technology sites to make up 32% of all electricity demand by 2030. Almost all the extra demand already signed up is around Dublin. Since December 2025 the energy regulator’s rules say a new data centre must bring its own power plant or batteries, on site or nearby, as big as the grid connection it asks for. It must also match at least 80% of its yearly use with new renewable power made in Ireland.
The bigger pictureWorldwide, data centres used about 1.5% of electricity in 2024 (IEA). Ireland’s share is about 15 times that.
Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh. 1 TWh = 1 billion kWh.
- 5 % 2015: 1,240 GWh, metered
- 11 % 2020: 3,030 GWh, metered
- 21 % 2023: 6,339 GWh, metered
- 22 % 2024: 6,973 GWh, metered
- 23 % 2025: 7,663 GWh, metered
- 32 % 2030, forecast: EirGrid: data centres plus other new technology sites, share of all demand
Unit: %.
Why the claim misleads
Ireland is a small country with a lot of data centres. Dublin is one of the cities where most of Europe’s data centres are concentrated (IEA). The regulator says Ireland has been very successful in attracting them, taking their share of national electricity demand from 5% in 2015 to 22% in 2024.
What nobody knows yet
- The CSO only counts electricity that comes through a meter on the mains network. Hum hasn’t found an official count of electricity that data centres make for themselves on site.
- There is no agreed definition of a data centre. The CSO picks out the meters itself, and says the figures for all years can be revised.
- Nobody publishes how much of this electricity goes to AI.
- The 2030 figure is a forecast. It also counts other new technology sites, and it is a share of all electricity demand, not of metered consumption, so it doesn’t line up exactly with the CSO’s 23%.
Sources (17)
- Central Statistics Office (Ireland), Data Centres Metered Electricity Consumption 2025 (7 July 2026; metered consumption) Measured
“The percentage share of total metered electricity consumption used by data centres rose to 23% in 2025 from 5% in 2015”
Quote checked on the page, 14 Nov 2026 - Central Statistics Office (Ireland), Data Centres Metered Electricity Consumption 2025 (7 July 2026; metered consumption) Measured
“Metered electricity consumption by data centres increased by 10% in a single year, rising from 6,973 Gigawatt hours (GWh) in 2024 to 7,663 GWh in 2025. Consumption by all other users, including residential and other business customers, went up by 2% over the same period”
Quote checked on the page, 14 Nov 2026 - Central Statistics Office (Ireland), Data Centres Metered Electricity Consumption 2025 (7 July 2026; metered consumption) Measured
“Total residential consumption of electricity, including both urban and rural dwellings, accounted for 28% of usage, compared with 23% by data centres”
Quote checked on the page, 14 Nov 2026 - Central Statistics Office (Ireland), Data Centres Metered Electricity Consumption 2025 (7 July 2026; metered consumption), statistician’s comment Measured
“For comparison, 2025 consumption stood at 18% for urban households and 9% for rural households”
Quote checked on the page, 14 Nov 2026 - Central Statistics Office (Ireland), Data Centres Metered Electricity Consumption 2025 (7 July 2026; metered consumption), statistician’s comment Measured
“Data centre consumption has grown every single year without exception, more than doubling between 2015 and 2019 from 1,240 GWh to 2,490 GWh, and tripling again between 2019 and 2025, reaching 7,663 GWh”
Quote checked on the page, 14 Nov 2026 - Central Statistics Office (Ireland), Data Centres Metered Electricity Consumption 2025 (7 July 2026; metered consumption), Table 1 rows: year, data centres (GWh), other metered customers (GWh), total (GWh), % data centres Measured
“2015 1,240 23,360 24,600 5 ... 2020 3,030 24,025 27,056 11 ... 2023 6,339 24,242 30,581 21 ... 2024 6,973 24,930 31,903 22 ... 2025 7,663 25,324 32,986 23”
Quote checked on the page, 14 Nov 2026 - Central Statistics Office (Ireland), Data Centres Metered Electricity Consumption 2025 (7 July 2026; metered consumption), background notes Measured
“Data centres were not readily identifiable in the meter data so the CSO examined around 2.6 million meters to identify Meter Point Reference Numbers (MPRNs) that were considered as primarily being used for data centre activity.”
Quote checked on the page, 14 Nov 2026 - Central Statistics Office (Ireland), Data Centres Metered Electricity Consumption 2025 (7 July 2026; metered consumption), background notes Measured
“A small number of data centres accounted for most of the metered electricity consumption by data centres.”
Quote checked on the page, 14 Nov 2026 - Central Statistics Office (Ireland), Data Centres Metered Electricity Consumption 2025 (7 July 2026; metered consumption), background notes Measured
“The data provided to the CSO covered all meters connected to the mains electricity network.”
Quote checked on the page, 14 Nov 2026 - Central Statistics Office (Ireland), Data Centres Metered Electricity Consumption 2025 (7 July 2026; metered consumption), background notes Measured
“There is no agreed definition of a data centre. ... Data for all years are subject to revision.”
Quote checked on the page, 14 Nov 2026 - EirGrid (Ireland’s grid operator), All-Island Resource Adequacy Assessment 2026-2035, Ireland report (median scenario; share of the total electricity requirement) Forecast
“Also notable is that by 2030, 32% of all electricity demand is expected to come from data centres and new technology loads.”
Quote checked on the page, 14 Nov 2026 - EirGrid (Ireland’s grid operator), All-Island Resource Adequacy Assessment 2026-2035, Ireland report News report
“demand is expected to continue to rise from current levels as these customers build out towards their contracted load. Almost all this extra load is contracted in the greater Dublin region”
Quote checked on the page, 14 Nov 2026 - Commission for Regulation of Utilities (Ireland’s energy regulator), news release on its data-centre connection decision (12 December 2025) Rule or law
“New data centres connecting to the electricity network will continue to be required to provide generation and/or storage capacity, either onsite or local in proximity to match the requested data centre maximum import demand capacity.”
Quote checked on the page, 14 Nov 2026 - Commission for Regulation of Utilities (Ireland’s energy regulator), news release on its data-centre connection decision (12 December 2025) Rule or law
“Data centres will be required to meet at least 80% of their annual demand with additional renewable electricity projects generating in the Republic of Ireland.”
Quote checked on the page, 14 Nov 2026 - Commission for Regulation of Utilities (Ireland’s energy regulator), news release on its data-centre connection decision (12 December 2025) News report
“Ireland has been very successful in attracting data centre development to date, resulting in electricity demand from data centres growing from 5% of national electricity demand in 2015 to 22% in 2024.”
Quote checked on the page, 14 Nov 2026 - IEA, Energy and AI (2025) Estimated
“Data centres accounted for around 1.5% of the world’s electricity consumption in 2024, or 415 terawatt-hours (TWh).”
Quote checked on the page, 3 Oct 2026 - IEA, Electricity 2024: Analysis and forecast to 2026 (report PDF, page 32) Estimated
“Around 1 240 data centres were operating within Europe in 2022, with the majority concentrated in the financial centres of Frankfurt, London, Amsterdam, Paris, and Dublin.”
Quote checked on the page, 8 Nov 2026
Hum’s sums
- 7,663 GWh ÷ 1,000 ≈ 7.7 TWh (Ireland’s data centres, metered consumption, 2025)
- 7,663 GWh in 2025 ÷ 1,240 GWh in 2015 ≈ 6.2, so about 6 times as much
- 23% in Ireland (2025) ÷ 1.5% worldwide (2024) ≈ 15.3, so about 15 times the world share. Rough: the years differ, and Ireland’s figure is a share of metered consumption
Cite this
Central Statistics Office (Ireland), Data Centres Metered Electricity Consumption 2025 (7 July 2026; metered consumption), as quoted in Hum, “How much of Ireland’s electricity do data centres use?”, https://humearth.org/q/ireland (quote checked 14 Nov 2026).
Cite the original source first; Hum is where you found it.
What do Wh, kWh and TWh mean?
Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh, and 1 TWh = 1 billion kWh. Hum compares each number with something everyday so you don’t need the units.
Send this answer
Data centres used 23% of Ireland’s metered electricity in 2025, up from 5% in 2015 (Central Statistics Office). That’s more than all the homes in the country’s towns and cities.